How Long Does it Take to Build a Porch?

July 30, 2018 Patio Contractor

Great question!

Actual construction of a porch can take anywhere from three to 16 weeks, depending on project complexity and the availability of the construction crews your porch pro works with. But the entire process, from design to permitting to final construction, can take up to six months, says Douglass of Texas Custom Patios.

Our very own Rob Douglass was recently interviewed in a wonderful article by Houzz.  So many great questions were answered, like:  What to consider before building a porch, what’s the upkeep like, the difference between materials and how much does it cost?

Find some shade and enjoy the good read, by clicking here!

Have a project in mind? We work throughout the Houston and Dallas - Fort Worth areas.

Our Customers Love Us

I have a lot of experience with construction and renovations, so some contractors find me annoying at best. My outdoor living project was larger than I was able to take on as it entailed adding an outdoor living area, kitchen, dining room, and bathroom with a fireplace and fire pit. It’s built onto an existing structure with a tile roof in a seamless manner. The completed project is amazing, and was featured in the Houzz project of the month for December 2013. It was a very large project so it took a long time to complete, however the process was absolutely painless. In my previous experiences, I have always had issues with miscommunications and added costs, among other things. My experience with Texas Custom Patios included NONE of these issues. The finished project far exceeded my expectations. The workmanship was superior, and the quality of the products is top of the line. I truly highly recommend them.

© 2024 TCP Custom Outdoor Living

Thank you for your submission!

We will get back to soon!