How Long Does it Take to Build a Porch?

July 30, 2018 Patio Contractor

Great question!

Actual construction of a porch can take anywhere from three to 16 weeks, depending on project complexity and the availability of the construction crews your porch pro works with. But the entire process, from design to permitting to final construction, can take up to six months, says Douglass of Texas Custom Patios.

Our very own Rob Douglass was recently interviewed in a wonderful article by Houzz.  So many great questions were answered, like:  What to consider before building a porch, what’s the upkeep like, the difference between materials and how much does it cost?

Find some shade and enjoy the good read, by clicking here!

Have a project in mind? We work throughout the Houston and Dallas - Fort Worth areas.

Our Customers Love Us

We are very happy we chose Texas Custom Patios to build our dream patio/outdoor kitchen. Our project manager, Ryan, really listened to what we wanted and grasped our vision immediately. He was actively involved in the process from start to finish. Every question or concern was addressed immediately. We were part of every decision along the way, and were pleased with the flexibility of the process. Ryan had a positive “can do” attitude that was much appreciated through out. The various work crews were professional and always left the work site as clean as possible at the end of the day. The final product is absolutely breathtaking!

© 2022 TCP Custom Outdoor Living